Agile & AI Change Agent

Reclaiming how teams deliver value in the age of AI.

I help organizations strip agile back to first principles and put AI to work where it actually moves outcomes — then I build the software that proves it. Strategy on one side, shipped product on the other.

Google Gen AI Leader Scaled Agile Practitioner (SPC) 3 shipped products

About

Part transformation lead, part builder.

I'm Samuel D. Martin — an agile and AI change agent working at the intersection of delivery strategy and hands-on engineering. My career has centered on helping teams move faster with less ceremony: not "Scrum police," but an architect of flow.

The last few years made one thing clear: AI is a burning platform for how software gets delivered. Rather than defend legacy rituals, I focus on the parts of agile that still matter — real interactions, adaptive methods, and shipping working software — and I use AI to compress everything in between.

That conviction shows up as more than talk. The three products below are ones I've designed and built end-to-end, each turning a heavy, consultant-priced workflow into something a small team can actually run.

Principle 01
Interactions over artifacts
Ceremonies serve the work — not the other way around.
Principle 02
Methods over rituals
Keep what adapts; retire what's just habit.
Principle 03
Adaptation over adherence
Respond to the burning platform — AI is real, and it's here.

Expertise

Where I create leverage.

From framework-level coaching to production code — a rare full stack that spans the org chart and the codebase.

Agile Transformation

SAFe & Scrum delivery, PI Planning facilitation, and flow engineering that trims ritual without losing rigor or oversight.

Applied AI

Designing AI co-pilots and automation into real workflows — where a suggestion saves a schedule, not where it just looks impressive.

Product Engineering

Shipping modern web apps end-to-end — Next.js, serverless data, offline-first field tooling, and clean interfaces people adopt.

Portfolio

Products I've designed & built.

Three live platforms, each collapsing an expensive, fragmented workflow into one flat-priced tool a small team can run without IT.

Construction Management

BearingCPM

Founder & Builder · Product + Engineering

Enterprise scheduling power at a small-firm price. BearingCPM gives the 5-person GC the same critical-path depth that $50M firms pay consultants for — a full WBS scheduling grid, earned-value financials, resource leveling, and an AI orchestration console. One flat price. Zero IT required.

Feature set

  • WBS scheduling grid with a deterministic CPM engine — durations, dependencies & float recalculated instantly
  • Earned-value financials: baseline budget (PV), earned value (EV) & actual cost (AC) with progress invoicing
  • Resource loading histogram & subcontractor leveling across trades and concurrency peaks
  • AI Orchestration Console — auto-provisions WBS, re-estimates lags, pings contractors
  • Baselines, look-ahead, daily reports & reusable project templates
  • "Site Verified Feed" for field evidence; automated G702/G703 pay apps
  • Bilingual (EN/ES), offline-capable field app

Technical stack

Next.js 14ReactApp Router / i18n Firebase App HostingAI OrchestrationOffline-first PWA
bearingcpm.com
BearingCPM — WBS scheduling grid with Gantt bars, resource loading histogram, earned-value financials and AI orchestration console
Agile / SAFe Tooling

PI Planning Studio

Founder & Builder · Product + Engineering

Plan, Align, Deliver. A collaborative SAFe PI Planning platform built for real-time, multi-team planning — team boards, story maps, an ART board, capacity-aware iteration planning, and confidence voting, all in one shared session.

Feature set

  • Team Planning Board with drag-and-drop stories mapped across iterations (I1–I3)
  • Live load vs. capacity bars per iteration to prevent over-commitment
  • Committed / uncommitted PI Objectives with business-value tagging
  • Risk board (ROAM), Story Map, ART Board & program backlog
  • Confidence Vote for team and ART-level alignment
  • Shareable team codes for real-time multi-user sessions
  • "My Classes" mode — built to teach and run SAFe PI Planning

Technical stack

Next.js 14ReactFirebase App Hosting Firestore (real-time)Tailwind + shadcn/uiFirebase Auth
piplanningstudio.com
PI Planning Studio — team planning board with committed objectives, risks, and iteration columns showing load vs capacity
Consumer / Gaming

HQ Companion

Creator · Product + Engineering

A beautifully art-forward companion app for players of the classic HeroQuest board game. It digitizes the bookkeeping side of tabletop play — champion sheets, stats, gold, and equipment — behind a premium dark-fantasy interface, so the table stays focused on the adventure. A polished passion project that shows range beyond the enterprise.

Feature set

  • Illustrated champion sheets with editable Body / Attack / Defend / Mind stats
  • Interactive stat orbs with max values, plus a live gold counter
  • Drag-and-drop equipment grid — equipped vs. empty slots at a glance
  • Inventory, treasure draws, blacksmith & alchemy shops, quest & party tracking
  • Shareable read-only character links
  • Installable, mobile-app-shaped PWA experience

Technical stack

Next.js 14ReactFirebase App Hosting FirestoreFirebase Auth (Google)Tailwind + shadcn/ui
hqcompanion.com
HQ Companion — illustrated champion sheet for Sir Hugh Bris with Body/Attack/Defend/Mind stat orbs, gold counter and drag-and-drop equipment grid

Contact

Let's talk delivery, AI, or building the thing.

Whether you're transforming how a team ships or need a product taken from idea to live, connect with me on LinkedIn.